When on a page you would like to add to your quick links click the appropriate Add this page to My H&K Quick Links to the left of this icon.
Home  :  About Us  :  News  :  Contact Us  :  Job Opportunities  :  Employee Portal
 
The H&K Group
Site Contracting & Demolition Construction Materials Landscape Materials Recycling & Reclamation Fill Facilities Recycling & Reclamation Fill Facilities

Skip Navigation Links

Arcadia University Arcadia University Site Contracting Excavating Services Crushed Stone Sand Gravel Road Highway Paving


Terra Structures
11/1/2007 - 5/1/2008
Project Type: Commercial
 
Client: Delran Builders
 
Owner: Arcadia Univiersity
 
Services Include:

Skip Navigation Links.

MSE Structures

Additional Project Features:

  • Temporary Shoring
  • Soil Nailed Retaining Wall
  • Segmental Retaining Wall
  • 110 Soil nails @ 28’ depth
  • 1,300 S.F. Anchor ‘Landmark’ Soil Nailed R/W
  • 800 S.F. Conventional Geogrid R/W
  • Engineer: Earth Engineering Inc.
  • The addition of Arcadia University’s ‘Brubacker Hall’ would require a major excavation around an existing 20’ wide spread footer to a pedestrian bridge. In order to install the access road for the new building, the footer had to have 5’ cut off of it while still supporting the bridge. Terra Structures and Earth Engineering worked together to come up with a solution for temporary and permanent stabilization of the structure and soil surrounding it. Soil nails were used to stabilize the footer while it was saw cut. Due to the confined space between the buildings; soil nails were used for the remainder of the wall in conjunction with Anchor ‘Landmark’ block. After completion of the soil nailed wall, a conventional geogrid wall was added.
  •  

  
  
Home | About Us | News | Contact Us | Site Search | Job Opportunities | FAQ | Site Map
Copyright © 2006-2017 The H&K Group | P.O. Box 196, 2052 Lucon Road, Skippack, PA 19474 | Phone: 610-584-8500

What is this?